skip to main content
By Jakub Link-Lenczowski |

Poland launches its first Miecznik frigate

News
Share:

A side profile of Poland's first Project 106 Miecznik frigate, Wicher, being launched off Gdynia on 12 August 2026. (Jakub Link-Lenczowski)

On 13 August 2026, Janes observed PGZ Naval Shipyard (PGZ Stocznia Wojenna) launch Wicher , the first of three Project 106 Miecznik frigates being built for the Polish Navy based on Babcock's Arrowhead 140 design.

Unlike a conventional slipway launch, the operation was carried out using the Boabarge 33 semi-submersible heavy transport barge, reflecting both the size of the vessel and the infrastructure available at PGZ Stocznia Wojenna in Gdynia.

On 9 August, Wicher was rolled out of the shipyard's hull integration hall and transferred onto Boabarge 33. The frigate was moved using a set of 287 synchronized self-propelled modular transporters (SPMTs) before being positioned and secured on the barge. This marked the first time the hull had left the construction hall since assembly began.

Jan Grabowski, PGZ Management Board member responsible for naval programs, told Janes : “The roll-out of the future ORP Wicher is a symbolic moment. The Polish defence industry is demonstrating to the customer that it is delivering, on time and within budget, exactly what the customer expects.”

On 12 August, Wicher was formally christened in Gdynia in the presence of the President of Poland Karol Nawrocki, and Prime Minister Donald Tusk.

Go beyond the headlines - with direct links to interconnected entities

Get full access to validated equipment, military capabilities, and market insights.

Never miss updated intel from Janes.

Move faster with human-validated intelligence.

Get equipment and weapon intelligence that’s human-validated, connected, and ready for your mission workflow.

Message Received!

Message received. Thank you for getting in touch, our team will reach out to you soon.


In the meantime... check out our OSINT insights