skip to main content
By Chinmay Kohad |

Nigeria orders second OCEA survey vessel

News
Share:

A schematic of the OCEA OSV 115 survey ship ordered by Nigeria. (OCEA)

French shipyard OCEA has confirmed that the Nigerian Navy has awarded it a contract to build a second hydrographic survey vessel.

It announced on 12 October that the new OSV 115 SC-WB survey vessel will be 35 m long, making it smaller than NNS Lana , the 60 m OSV 190 SC-WB it delivered to the Nigerian Navy earlier this year.

The OSV 115 is a new design that the company said would be equipped with multi- and single-beam echosounders, water sampling capability, a web laboratory, and a 5.6 m boat equipped to carry out surveys in shallow water. It will have a crew of 12, have a top speed of 12 kt, and a range of 3,000 n miles at 10 kt.

Nigerian Navy Commander Vice Admiral Az Gambo said on 15 August that a 35 m survey ship had been ordered but did not say which company would construct it.

The navy has said that the re-establishment of its hydrographic capability will enable it to contribute to the General Bathymetric Charts of the Oceans' (GEBCO's) Seabed 2030 project and the Global Multi-Resolution Topography (GMRT) synthesis project, helping to fulfil Nigeria's obligations under the International Convention for the Safety of Life at Sea.

Go beyond the headlines - with direct links to interconnected entities

Get full access to validated equipment, military capabilities, and market insights.

Never miss updated intel from Janes.

Move faster with human-validated intelligence.

Get equipment and weapon intelligence that’s human-validated, connected, and ready for your mission workflow.

Message Received!

Message received. Thank you for getting in touch, our team will reach out to you soon.


In the meantime... check out our OSINT insights