Air Platforms

First Block 2 JF-17s under construction in Pakistan

30 June 2014
Production of the first two of 50 Block 2 JF-17s on order by the Pakistan Air Force is now well under way at the Pakistan Aeronautical Complex, Kamra. Source: Alan Warnes

Production of the first two of 50 Block 2 JF-17s on order by the Pakistan Air Force (PAF) is now well under way at the Pakistan Aeronautical Complex, Kamra, with the first expected to fly by the end of the year.

The Block 2 JF-17 has several capability increases over the Block 1s, but the main boost to the PAF as well as to export potential is the installation of an air-to-air refuelling system. One aircraft has been fitted with a refuelling probe, which protrudes from the right side of the fuselage just behind the cockpit, sitting forward of the pilot's position. It is being used for flight trials.

However, this modification will not appear in Block 2 aircraft until midway through the production at the Aircraft Manufacturing Factory (AMF), probably in early 2016, PAF officials said. Coupled with software enhancements, other new features include an upgrade to the avionics system that works around China's Nanjing KLJ-7 radar.

A detail of the refuelling probe on one of the first two Block 2 JF-17s. (Alan Warnes)A detail of the refuelling probe on one of the first two Block 2 JF-17s. (Alan Warnes)

As a result, the Block 2s can add the Chinese-designed C-802 anti-ship missile and SD-10A beyond-visual-range air-to-air missile to the Block 1s' existing armoury, which includes Mk 82/84 dumb bombs and the PL-5-EII short-range air-to-air missile. All the Block 1s will eventually be upgraded with the Block 2 improvements.

With an urgent need to export JF-17s, a two-seater will be built in the Block 2 time frame. The PAF had always said that a two-seater is not urgent, but Air Chief Marshal Tahir Rafique Butt now admits that a dual seater is a necessity. "We realise that it is required, because the air forces interested in buying JF-17 want one," he said.

PAF pilots currently converting to JF-17 are accumulating around 25 hours on a JF-17 simulator operational at Kamra, where one of the two operational squadrons is based. Nearly all the Block 1s have now been delivered to the PAF, which has a current requirement for 150 to replace the ageing F-7P and Mirage III/Vs.

Related article: Myanmar looks to acquire JF-17 aircraft



(332 words)
By posting a comment you confirm that you have read and accept our Posting Rules and our Terms of Use of this site.

RELEVANT PROFILE LISTINGS

  • MVP.Aero

    At AirVenture, Oshkosh, on 28 July 2014, MVP.Aero made the public launch of its as-yet unbuilt Model 3 two-seat flying boat, which will be powered by a Rotax 912 or 914 piston engine. Equipped with 'repositionable' landing gear bestowing additional land or snow capability - described as 'triphibian'

  • Antonov An-32

    Type Medium transport. Programme Prototype (SSSR-83966, converted An-26) first flew on 16 July 1976. In late 1976 the prototype was re-engined with AI-20DM engines. Further three pre-series aircraft completed by October 1982 at Aviant Plant (KiGAZ) in Kiev. Began state acceptance tests at

  • Altavian Nova F6500

    Type Multi-purpose fixed-wing UAV. Development Altavian was established in 2011 and describes the Nova F6500 AV as being designed for data collection in natural resource/conservation, construction/infrastructure, agriculture and inspection/monitoring applications. Again, the AV is described as

  • MAVinci Sirius

    Type Fixed-wing survey UAV. Development MAVinci characterises the Sirius AV as being an 'orthophoto' platform that is suitable for the 'documentation and representation' of urban areas, construction sites, disaster areas and areas of crop/forest damage together with the surveying of

  • Aero Surveillance AS 50 EC

    Type Fixed-wing surveillance UAV. Development Aero Surveillance characterises the AS 50 EC as being a 'small tactical UAV' that is suitable for applications such as military ISR, convoy protection, oil/gas infrastructure monitoring, environmental monitoring, agricultural support and

ADVERTISEMENT

Industry Links

IHS Jane's is not responsible for the content within or linking from Industry Links pages.
ADVERTISEMENT